floating foundation deck system  
deckplans.com
free deck plans deck gallery how it works how to build deck build support building a deck support locate dek-block retailer
 
 
Summer 2002

Day 23 (Aug. 20th):
Today we decked the access platform, set the stringers and temporarily attached the treads. As you may be able to see, these stairs have an increased slope. We used a 5-1/2" riser and a 12-1/2" tread. Walking up and down these stairs is a real pleasure!
 
 
 
 
 
  We also cut and set most of the hand rail posts about the main deck. We're still thinking about a good design for the hand rail for the right side of the stairs and how to tie it into its upper post (yet to be set). That post will also need to tie into main deck's hand railing.
     

 

1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13
14
- 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23

 

Home


© 2007 DekBrands. The content and plans provided on this site are for consumer use only. They may not be reproduced, copied or disseminated, except for consumer construction, without the written permission of DEKBRANDS. DEKBRANDS and Dek-Block are trademarks of Proshop Plans Co., Inc. Patent No. 5,392,575, 5,953,874, 6,324,801B1, 6,446,403B2, 6,550,201B2, and 6,609,346 Pat. Pend/App. Pend. Manufactured under license.