Deck System Logo
Deck System Logo
NEW

How to build the Deluxe Pool Deck


Step 15: Attach handrail posts.


Position and plumb (vertically level) 4"x4" pre-notched handrail posts at the locations found on the plan. Next, secure the 4"x4" handrail posts to the Splash deck support frame with two - 1/2" x 4" galvanized lag screws using washers at each connection. The 4"x4" handrail posts along the Deluxe section will be secured to the frame with two 1/2" x 4 1/2" galvanized lag bolts using washers on each side at each connection to the frame. Be sure to pre-drill each lag screw and lag bolt hole.

 

 

Printable Step by Step Instructions: Deluxe Deck


The printable version of our instructions are in Adobe PDF format.

You must have Adobe Acrobat to be able to view and print the plans. The Acrobat Reader is free from Adobe.


next  

Page:
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10
11 - 12 - 13 - 14 - 15 - 16 - 17

  next

|
|
|
|
|
|
|
|
|


© 2008 DekBrands. The content and plans provided on this site are for consumer use only. They may not be reproduced, copied or disseminated, except for consumer construction, without the written permission of DEKBRANDS. DEKBRANDS and Dek-Block are trademarks of Proshop Plans Co., Inc. Patent No. 5,392,575, 5,953,874, 6,324,801B1, 6,446,403B2, 6,550,201B2, and 6,609,346 Pat. Pend/App. Pend. Manufactured under license.